The Field of 206

The Field of 206

About the project

First 206-literated ground floor vaults – stone cladding wet with nylon anchor (nylon plug) GX-L M10x80 on Wall concrete and concrete screw TFE chemical adhesive to rebar CT50Pro

A video from project

Photos from the area

The Field of 206 1
The Field of 206 2
The Field of 206 3
The Field of 206 4
The Field of 206 5
The Field of 206
The Field of 206 7