The Negev Canyon is 7
About the project
Images of strengthening stone cladding in the Negev Canyon in Beer Sheva (designing the peoples of the Bohr) used such bars. PSZ SS316 Bergs in direct fastening may be converted to stone strengthening.
Photos from the area













Negev Mall, Be’er Sheva – securing existing cladding stones with PS/PSZ direct-threading screws
At the Negev Mall in Be’er Sheva the existing cladding stones were secured with PS/PSZ direct-threading screws. Reinforcing existing cladding is a different problem from a new installation: the stone is already in place, there is no access to its back face, and the condition of the original fixing is often unknown. A direct-threading screw allows the stone to be drilled through and pinned back to the structure without applying expansion pressure that could split the stone itself — and without stripping and re-installing an entire facade.