
Mar Log Stetsky Head of the Spring
About the project
Images of project connect shelves in the Steimsky logo at the head of a reference by Willar. The anchor was tested in a minute concrete sequence and was selected because it was also suitable for the load and also approved to correct earthquakes.
Photos from the area

















