
The “paper” Modi'in factory.
About the project
project images of the "Sir Paper" in Modi'in where the wet stone cladding was carried out with a type of concrete screw. PS Connecting the network on the existing wall and arrow arrows ORA into the angular connection.
Photos from the area













